| S. # |
Year |
Project
Description |
Supplier |
Customer |
|
1
|
2003 |
A Contract for the Inspection and Integrity Testing of Two Gas Compressors Units at BOBI Plant – Phase-I. |
EFX |
OGDCL |
|
2
|
2002 |
An EPC Contract for supply of Amine Sweetening Plant, Gas Dehydration Plant, Inlet Separators, Compressor Package, Power Generators, Metering Package, MCC, etc., for Mazarani Gas Field Development project. |
PRESSON |
PPL |
|
3
|
2002 |
A Contract for Engineering, Design and supply of Dewpoint Control and Dehydration Plant (dual trains) for Zamzama Gas Field Development Project. |
PRESSON |
BHP |
|
4
|
2002 |
A Contract for Engineering, Design and supply of Amine Sweetening Plant, Gas Dehydration Plant, Gas Metering, Package, MCC and Coolers, etc., for Tangri Oil & Gas Field. |
PRESSON |
BPP |
|
5
|
2002 |
A Drilling Services Contract (Rig T-75) for drilling of Manzalai # 1 in Tal Block. |
DTI |
MOL |
|
6
|
2001 |
A Contract for Engineering, Design, and supply of Gas Dehydration Plant, Metering Package, etc., for Mazari Field. |
PRESSON |
BPP |
|
7
|
2001 |
A Three year Workover Drilling Services Contract (Rig T-103) for oil / gas wells in Badin Concession Area. |
DTI |
BPP |
|
8
|
2001 |
A Three year Drilling Services Contract (Rig T-34) for oil / gas wells in Badin Concession Area. |
DTI |
BPP |
|
9
|
2001 |
Drilling Contract Ref: PC(P)L/2000/DR-01 of 2 Wells at Mubarrak Block, TD: 3400 mtr. Approx. |
DTI |
Petronas |
|
10
|
2000 |
Contract for Design, Engineering, Manufacturing, Supply and Commissioning of MDEA Plant for Sour Gas Processing, Capacity – 20 MMSCFD for Block 22. |
PRESSON |
PPL |
|
11
|
2000 |
Drilling Contract of 2 Wells at Mari Field, TD: 9600 Ft. approx. |
DTI |
MGCL |
|
12
|
2000 |
High Angle Drilling Contract for Meyal # 9TD: 14307 Ft. |
DTI |
POL |
|
13
|
1999 |
Long term Drilling/Workover Contract (approx. 11 wells) for Kirthar West & Kadanwari Blocks, etc. |
OGEC - Cracow |
LASMO |
|
14
|
1999 |
Well Drilling Contract Ref: BG/Pak/4040/HQ – Basira 1 Well , TD: 3800 Mtrs. approx. |
OGEC -Cracow |
BG |
|
15
|
1999 |
Contract for 2D Seismic Data Acquisition, Processing and Interpretation for Sabzal Block (Punjab). Qty: 183 lkm. |
GK, Poland |
POGC |
|
16
|
1998 |
Contract for 2D Seismic Data Acquisition, Processing and Interpretation for Khanpur West Block # 2870-1, Qty: 283 lkm. |
GK, Poland |
POGC |
|
17
|
1998 |
Contract for Reprocessing & Interpretation of 2D Seismic Data (old) acquired over Khanpur West & Sabzal Blocks, Qty: approx. 2400 lkm |
GK, Poland |
POGC |
|
18
|
1998 |
Well Drilling Contract for Sawan II, TD: 3498 Mtrs. And Gajwaro I Wells. TD: 3598 Mtrs. |
OGEC - Cracow |
OMV |
|
19
|
1998 |
Well Drilling Contract # PAK/001/98 – Zarghun South-1. TD: 2094 Mtrs. |
OGEC -Cracow |
Premier |
|
20
|
1998 |
Workover Contract # DRL 0198 – Bhangali-1 Well, TD:15,000 Ft. |
OGEC - Cracow |
OPI |
|
21
|
1997 |
Well Drilling Contract # DRL 0296-DIAAL 1, TD: 3732 Mtrs. |
OGEC - Cracow |
OPPI |
|
22
|
1996 |
Contract for Up-gradation of Geolog 1000, borehole logging system for mineral exploration. |
RGL |
DTP |
|
23
|
1996 |
Contract for 3D Seismic Data Processing acquired over Pindori, Ahmedal and Balkassar Blocks.Total Area: 600 sq. km. (Approx.) |
BGP, China |
POL |
|
24
|
1996 |
Contract for 3D Seismic Survey at Ratana, Coverage Area: 138 sq. km. |
BGP, China |
OXY |
|
25
|
1995 |
Contract for Design, Engineering, Fabrication and Supply of Gas Dehydration Plant with Gas Power Generator & Spares for Punjpir Gas Field. Capacity: 30 MMSCFD. |
PRESSON |
OGDCL |
|
26
|
1995 |
Contract for Supply of 50 Units of Static Road Rollers, Capacity 10-12 Tons with Spare Parts & Training for Farm-to-Market Project under ADB Loan. |
CNM Corp., China |
M/o Local Govt. & Rural Development |
|
27
|
1995 |
Semi-Turnkey Contract for Design, Engineering, Manufacturing and Supply of a complete Early Production & Processing Facilities (EPF) at Pariwali, Distt. Attock, consisting of: 3 Phase Separator Packages, H2S Removal Plant, Dehydration Plant, Crude Stabili |
PRESSON |
POL |
|
28
|
1995 |
Contract for Processing of 400 lkms, of 2D Seismic Data acquired over Cholistan Block. |
Geotrace Technologies, USA |
POL |
|
29
|
1995 |
Contract for 2D Seismic Data Acquisition (Dynamite) over Mari Field, Qty: 200 lkm. |
BGP |
MGCL |
|
30
|
1994 |
Supply of XGEO, GWIS & Bury Software and Training. |
Scott Pickford |
POL |
|
31
|
1993 |
Contract for Design, Engineering, Fabrication and Supply of Gas / Liquid Separators c/w Accessories & Equipment. |
PRESSON |
MGCL |